Export Hose Inspection at FPSO Tamara Tokoni, Oyo Oil Field

Export Hose Inspection at FPSO Tamara Tokoni, Oyo Oil Field

This project involved a comprehensive underwater inspection of the export hose system connected to FPSO Tamara Tokoni at the Oyo Oil Field. The goal was to assess the integrity, functionality, and safety compliance of the hose system to prevent leaks, structural failures, and environmental hazards.

Technology Used

ROV Inspection – Remote monitoring for hard-to-reach areas. Ultrasonic Thickness Testing (UTT) – Measuring wall thickness for wear detection. Magnetic Particle Inspection (MPI) – Checking for cracks and fatigue. High-Resolution Cameras & Sonar – Capturing visual data for analysis.

Project Status

Completed

Project Scope

Visual and NDT (Non-Destructive Testing) inspection of the hose structure.

ROV-assisted surveys to detect anomalies in hard-to-reach areas.

Thickness measurement and integrity assessment.

Cleaning and removal of marine growth where necessary.

Reporting and recommendations for maintenance or replacement.

Project Objective

Ensure the operational safety and reliability of the export hose.

Detect and assess any structural weaknesses, marine growth, or potential failure points.

Verify compliance with industry standards and regulatory requirements.

Challenges and Solutions

Strong Currents: Utilized high-precision ROVs for stability.

Biofouling & Sediment Build-up: Applied specialized cleaning techniques.

Access Constraints: Deployed divers for close-up inspections where ROVs had limitations.

Impacts and Outcome

Verified the integrity of the export hose, ensuring safe crude transfer.

Identified areas for preventive maintenance, reducing downtime risks.

Enhanced compliance with safety regulations and industry best practices.

More Projects

The maintenance operation at Aunty Julie Platform focused on ensuring the integrity and efficiency of the pipeline network and wellheads. …

Read More

The underwater hull cleaning and propeller polishing of MT Advantage Summer aimed to enhance the vessel’s hydrodynamic efficiency by removing …

Read More

The underwater inspection of Tulja Kalyani was conducted to evaluate the structural condition of subsea components and hull integrity. This …

Read More